Home / ProductsProduct lines
Ratings and lead times, line by line
Each page lists the ratings, construction and lead time for one line. Pricing is by quote. Equipment that is already built is on the available inventory page.
LEAD TIME 8-10 WK
38 kV metal-enclosed fused switchgear
38 kV max, 600 A bus, 25 kA, 150 kV BIL. NEMA 3R outdoor, bottom entry, front and rear access.
Ratings and lead time →LEAD TIME ~30 WK38 kV SF6-free dry-air GIS
38 kV, 1200 A, 31.5 kA, IAC AFLR. Metal-enclosed, indoor, to IEEE C37.20.9.
Ratings and lead time →LEAD TIME 18-20 WKUL 891 switchboards and UL 67 panelboards
Mains to 5000 A, 65 kA and 100 kA builds, main-lug-only boards and key-interlocked maintenance bypass.
Ratings and lead time →Not on this list?
Transformers, metal-clad switchgear and other distribution equipment are quoted from your single line. Upload a single line and we will come back with options.
One RFQ. Multiple vendors. Better solutions.
Calls and texts are answered around the clock and every request is logged.